Jamaica National Water Commission (NWC) Project
“Prior to having SCADA system, crew members had to go site to site to ensure readings and to visually inspect if there was flow of water at sites that reported issues. Failure of equipment was noticed just when there was a complaint on the quality of the water supply.
Star Controls has been instrumental in the processes to have in place the most advanced and reliable SCADA system. The SCADA system is also playing a major role in feeding our advanced Non-Revenue-Water (NRW) Hydrology system. The NRW system is part of a nationwide effort to reduce the water losses and improve the quality of service.
We are looking forward to continuing working with Star Controls to improve our operations.” – Jeremy Wilson – Engineering and Capital Projects